Skip to main content

Upgrade and Rollback

Upgrade and Rollback

Field Value
Distribution WCT English — OpenC5ISR
Product OpenC5ISR
Release 0.15.1
Deployment openc5isr-en.wallacecorptech.com
Source /srv/wct/releases/OpenC5ISR-v0.15.0
Evidence Lifecycle pattern and optional release comparison
Source fingerprint 63d2b1097707e25d666401cdc6362e395968600a40a08690210cd8c0b75fbf50
Status Generated baseline — human review required

Verification boundary: This page combines platform design guidance with static evidence from the release. It does not prove that every detected interface is enabled, reachable, secure, or operational in the deployed environment.

Pre-upgrade gate

  • Previous release path and rollback command are known and tested.
  • Database/configuration migrations are identified, backed up and reversible or explicitly irreversible.
  • External interfaces and dependent modules have compatibility expectations recorded.
  • A maintenance/communications plan exists for user-visible interruption.
  • Acceptance tests and responsible reviewer are assigned.

Upgrade sequence

backup → stage new release → install/validate dependencies → migrate if required
→ switch active release → restart affected services → smoke/acceptance tests
→ observe → approve or roll back

Rollback sequence

stop traffic/affected service → restore compatible data/config if required
→ repoint active release → restart → validate local/public endpoints
→ record incident and preserve failed-release evidence

Release-specific comparison

No previous release was supplied. Run with --compare /path/to/previous-release to generate a static change inventory.


Maintainer Notes

Add human-reviewed deployment notes, corrections, decisions, screenshots, and links here. Content outside the generated block is preserved on future runs.